Project

WisDOT Milwaukee Zoo Interchange

A deteriorating freeway system, obsolete design of the roadway and bridges, current and future capacity issues, and high crash rates were key factors leading to the redesign of the Zoo Interchange. The redesigned interchange increases efficiency, reduces accidents, and adds capacity to the roadway.

Cotter provided construction engineering and inspection of pavement, storm sewer, and grading. Cotter staff ensured compliance with plans and specifications. Cotter also provided office engineering, running pay estimates, preparing change justifications and modifications.

Milwaukee, Wisconsin

Location

2018

Project completion

Project Team

We are incredibly proud to have been part of this pivotal project for WisDOT. These types of projects bring significant improvements in safety and efficiency that are vital to the motoring public.

Did you know?

Originally completed in 1963, the Zoo Interchange was a major component in the freeway system being developed in Milwaukee and southeastern Wisconsin. It was considered a wonder of engineering at the time..

Have a project
in mind?